World 

ANTALYA, Türkiye,  — The Turkish Naval Forces have deployed HAVELSAN’s Barkan unmanned ground vehicle (UGV) during amphibious raid and urban warfare training in the ongoing TURNAs-2026 exercise, using the robotic vehicle to support troop landings and evacuate simulated wounded personnel. The exercise is taking place in the Gulf of Antalya and the eastern Mediterranean from October 19 to 27, 2026. It focuses on coordinating crewed military platforms with unmanned aerial, surface, underwater and ground systems. During simulated landing operations, the Barkan moved alongside naval infantry during the initial raid and subsequent urban combat phases. After the simulated fighting ended, the vehicle transported wounded personnel to safety. Exercise imagery also showed the vehicle carrying a stretcher near a landing craft.   TURNAs-2026 Involves Multiple Unmanned Systems According to figures reported by Anadolu Agency, citing Türkiye’s Ministry of National Defense, the exercise involves 18 ships, 11 aircraft, nine unmanned aerial vehicles, seven unmanned underwater vehicles and nine unmanned surface vessels. A total of 41 systems from 17 Turkish defense companies are participating. The crewed assets include an amphibious ship, frigates, corvettes, fast attack craft, a submarine, a mine hunter, landing ships and SH-70 helicopters. These are operating alongside unmanned surface vessels, one-way attack boats and Coast Guard vessels. The Ministry of National Defense has also reported successful unmanned reconnaissance and surveillance in the amphibious target area, suppression of simulated coastal defenses, and amphibious raids combined with urban combat. Exercise imagery identified TCG Anadolu and showed the Barkan transferring a simulated casualty into a landing craft. HAVELSAN-Yonca-built Sancar unmanned surface vessels, including a configuration fitted with a towed sonar, were also seen during the drills.   Barkan UGV Designed for Multiple Missions Developed by Ankara-based defence company HAVELSAN, the Barkan is a medium-class, wheeled unmanned ground vehicle designed to support military personnel in high-risk operations. It was developed under the company’s Digital Troops concept, which aims to connect unmanned ground, aerial and naval platforms so they can share information and perform coordinated tasks. The Barkan has a modular design that allows different equipment to be fitted for missions such as reconnaissance, surveillance, casualty evacuation, bomb disposal and battle damage assessment. HAVELSAN lists weapon systems, robotic arms, rescue equipment and swarm capabilities among the platform’s available functions. The Barkan family entered the Turkish Armed Forces inventory in 2023 and moved into mass production in 2025 following a decision by Türkiye’s Presidency of Defense Industries. In May 2026, HAVELSAN unveiled the Barkan 3 configuration at SAHA Expo in Istanbul under a contract amendment with the Presidency of Defense Industries. The new version is intended to support coordinated operations with unmanned aerial vehicles and surface vessels.   Unmanned Ground Vehicles in Amphibious Operations The deployment comes as militaries explore ways to use unmanned ground vehicles for landing operations and frontline resupply. Ukraine has reported using unmanned boats to deliver ground robots to combat areas and employing an amphibious unmanned ground vehicle to transport supplies across land and water. In July 2026, Ukraine’s 123rd Separate Territorial Defense Brigade used an unmanned surface vessel to land an armed ground robot on the Russian-occupied Kinburn Spit. In late September, Ukraine’s 93rd Separate Mechanized Brigade also conducted a frontline supply mission using the domestically developed Triton amphibious unmanned ground vehicle, which covered more than 40 kilometers across land and water, according to the supplied information. The TURNAs-2026 exercise is scheduled to conclude on October 27. No detailed results of the Barkan’s performance during the exercise have been released.

Read More → Posted on 2026-10-24 15:39:50
 U.S 

CALIFORNIA,  — U.S. defense company Zone 5 Technologies has demonstrated a ground-launched version of its AGM-188A Rusty Dagger cruise missile, introducing a new configuration designated Block 40. The upgraded variant adds ground and sea launch capabilities to a missile previously designed primarily for aircraft deployment. The new configuration was revealed through images shared with defense publication The War Zone on October 22. The missile was developed under the U.S. Air Force’s Extended Range Attack Munition (ERAM) program, which focuses on affordable, mass-producible cruise missiles, initially to meet Ukraine’s requirements.    Block 40 Adds Ground and Sea Launch Capabilities The main change in the Block 40 configuration is the addition of a solid-fuel rocket booster at the rear of the missile. This allows it to launch from ground-based and sea-based platforms while retaining its ability to be deployed from aircraft. Zone 5 has confirmed that the missile is certified for four fighter types, including the F-16. It can also be launched from special pallets carried by military transport aircraft. The upgraded missile can carry warheads weighing 100 to 250 pounds (approximately 45 to 113 kg), compared with the previously stated maximum of about 45 kg. Visible changes include more rounded tail stabilizers, while further design modifications have not been publicly detailed. An autonomous visual navigation system was previously announced for the Rusty Dagger, but its integration into the earlier Block 20 version was not confirmed. It remains unclear whether Block 40 introduces this capability.   Range Depends on Launch Conditions The AGM-188A Rusty Dagger has a reported maximum range of approximately 930 kilometers under favorable conditions, including a high-speed, high-altitude aircraft launch and a lighter warhead. For low-altitude aerial launches, the previously reported range is up to 300 nautical miles, or approximately 555 kilometers. The ground-launched Block 40 is expected to have a shorter range than the maximum air-launched configuration because it must use its booster to reach cruising conditions. However, the company has not released exact range figures for the new variant.    Ukraine Deployment and Production Expansion The Rusty Dagger was developed under the ERAM program primarily to meet Ukraine’s needs. Deliveries under the program were scheduled to begin in October 2026, although the extent of completed deliveries has not been confirmed. Russian forces have reportedly recovered debris matching the missile following precision strikes in Ukraine. Zone 5 has acknowledged the weapon’s deployment and stated that the Rusty Dagger is the only publicly reported operational missile of its class in service with Ukrainian forces.  Zone 5 says it developed the surface-launch configuration in less than three months, moving from design to demonstration. The company has also confirmed that versions of the missile have been selected for separate U.S. Army and U.S. Navy programs focused on affordable strike weapons. Production is expanding at facilities in California and Texas, with additional capacity planned in Ohio. Each facility is designed to support annual production of more than 2,500 missiles by the end of 2027, according to the company.  The Block 40 demonstration expands the Rusty Dagger’s launch options beyond aircraft, potentially allowing the missile to be deployed from land and sea platforms. Further details about testing, performance and future deliveries of the new configuration have not been publicly disclosed.

Read More → Posted on 2026-10-24 13:57:14
 U.S 

SAN DIEGO, — The U.S. Navy’s Arleigh Burke-class guided-missile destroyer USS Pinckney (DDG 91) has become the first destroyer to enter Phase Two of the DDG MOD 2.0 modernization program. The work is being carried out at a General Dynamics NASSCO drydock in San Diego following the ship’s eight-and-a-half-month deployment to the Middle East and Pacific. The modernization includes Raytheon’s AN/SPY-6(V)4 radar and Lockheed Martin’s Aegis Combat System Baseline 10. The radar will replace the ship’s existing AN/SPY-1D(V) system, improving its ability to detect and track air and surface threats while supporting air and ballistic missile defense. The work is covered by a $149.6 million contract awarded to General Dynamics NASSCO and is scheduled for completion by September 2028.   SPY-6 Radar and Cooling System Upgrades The AN/SPY-6(V)4 radar uses four fixed array faces, each containing 24 Radar Modular Assemblies, for a total of 96 modules. Designed for Flight IIA destroyers, the configuration is intended to operate within their existing power capacity and provide 360-degree situational awareness. Combined with Aegis Baseline 10, the radar is designed to improve the ship’s ability to respond to multiple threats, including ballistic, hypersonic and cruise missiles, as well as other airborne and surface threats. The modernization also includes the Navy’s High Efficiency Super-Capacity (HESC) air conditioning plants to support the increased cooling requirements of the upgraded systems. USS Pinckney is reported to be the first U.S. Navy ship to receive both the SPY-6(V)4 radar and HESC plants. Raytheon began manufacturing radar modules for Pinckney in early 2024. In August 2026, a test array was installed at the Navy’s Surface Combat Systems Center on Wallops Island, Virginia, for shore-based integration and testing before installation aboard the ship. Capt. Tim Moore, program manager for DDG MOD 2.0, said the modernization would equip Pinckney with an integrated sensor suite designed to support U.S. maritime superiority for decades.   DDG MOD 2.0 Upgrade Program The DDG MOD 2.0 program is a major mid-life modernization effort for selected Arleigh Burke-class destroyers, intended to bring Flight IIA ships closer to the capabilities of newer Flight III vessels. The broader effort covers approximately 20 ships, with an estimated total cost of $17 billion. During Phase One, four destroyers received the SLQ-32(V)7 Surface Electronic Warfare Improvement Program (SEWIP) Block III electronic warfare suite. USS Pinckney completed this work first, followed by USS Chung-Hoon (DDG 93), USS James E. Williams (DDG 95) and USS Halsey (DDG 97). The initial work also included modifications to accommodate the electronic warfare arrays. These four destroyers form an initial group for evaluating the modernization process. The Navy plans to combine electronic warfare and radar upgrades into a single shipyard period for future ships to reduce the time they spend out of service. USS Sterett (DDG 104) is expected to be among the first destroyers to receive the combined upgrades.   Supporting Fleet Operations USS Pinckney returned from its deployment on August 9, 2026, after operating in the Middle East and Pacific since late November 2025. According to the Navy, the destroyer validated several advanced warfare capabilities in operational environments during the deployment. The upgrades come as U.S. Navy destroyers face growing demands in the Indo-Pacific and Middle East, where they help protect carrier strike groups, commercial shipping and allied assets against increasingly capable missile and drone threats. The installation of the SPY-6 radar, Aegis Baseline 10 and upgraded cooling systems is intended to strengthen the ship’s detection and combat capabilities. The experience gained from USS Pinckney and the other initial ships will also help the Navy improve the efficiency of future modernization work across its destroyer fleet.

Read More → Posted on 2026-10-24 13:54:34
 World 

KOMSOMOLSK-ON-AMUR, Russia, — Russia has launched the Project 20380 corvette Grozny at the Amur Shipbuilding Plant, marking another step in the Russian Navy’s effort to strengthen its Pacific Fleet. The vessel is the fifth Project 20380 corvette built at the shipyard for the fleet. The launch ceremony was attended by Pacific Fleet Commander Admiral Viktor Liina and Khabarovsk Krai Governor Dmitry Demeshin. The event also marked the 88th anniversary of Khabarovsk Krai. Shipyard worker Margarita Borovaya followed naval tradition by breaking a bottle against the ship’s hull.   Grozny Moves Towards Completion Construction of Grozny began on August 23, 2021, under construction number 2105. The corvette has been assigned hull number 551. Slipway assembly has been completed, and the vessel has been transferred to the outfitting berth for further work. It was subsequently moved to the Amurets floating dock for launch. The ship will undergo sea trials and state trials before delivery to the Russian Navy. According to Admiral Liina, the crew has already been formed and began training on October 5, 2026. After completing their training, the personnel will work alongside shipyard staff on the remaining construction and preparation activities. Grozny is expected to enter service with the Pacific Fleet in the coming years. The four earlier Project 20380 corvettes built at Amur Shipyard for the Pacific Fleet are Sovershenny, Gromkiy, Geroy Rossiyskoy Federatsii Aldar Tsydenzhapov and Rezkiy. All four serve with the 44th Anti-Submarine Ship Brigade based in Vladivostok. Grozny is expected to join the same brigade after completing its trials. Another Project 20380 corvette, Bravyy, is under construction at the shipyard, with delivery planned for 2027.   Project 20380 Corvette Capabilities Designed by the Almaz Central Marine Design Bureau, Project 20380 corvettes, also known as the Steregushchiy class, are multipurpose warships intended primarily for coastal and near-sea operations. Their missions include anti-surface and anti-submarine warfare, air defence, patrol duties, escort missions and artillery support for amphibious landings. The class features a steel hull and composite superstructure designed to reduce radar signature. Key specifications include: Length: 104.5 metres Beam: 13 metres Average draft: 3.7 metres Full-load displacement: Approximately 2,200–2,250 tonnes Maximum speed: 27 knots Range: Approximately 3,500–4,000 nautical miles at 14 knots Endurance: 15 days Crew: 99 personnel, including 14 officers The corvette’s main armament includes the Uran anti-ship missile system with eight Kh-35 missiles, the Redut air-defence system, a 100 mm A-190 naval gun, two 30 mm AK-630M close-in weapon systems and the Paket-NK anti-submarine and anti-torpedo complex. Grozny also has a flight deck and hangar designed to accommodate one Ka-27 helicopter, which can support anti-submarine warfare and reconnaissance missions.   Amur Shipyard's Role in the Pacific Fleet The Amur Shipbuilding Plant, part of the United Shipbuilding Corporation, is an important supplier of warships for Russia’s Pacific Fleet. The shipyard has delivered 99 submarines and more than 100 surface ships over its history. The launch of Grozny continues the shipyard’s contribution to the construction of smaller surface combatants for Russia’s Far East. Further equipment installation, completion work and testing will be required before the corvette can enter operational service.

Read More → Posted on 2026-10-24 13:45:26
 U.S 

WASHINGTON, — The U.S. Department of Defense (Pentagon) has selected nine defense companies to supply approximately 60,000 one-way attack drones under the second phase of its Drone Dominance Program, known as Gauntlet II. The program aims to expand domestic drone manufacturing and equip U.S. forces with affordable unmanned systems. Gauntlet II was conducted over a month in August 2026 at Fort Carson, Colorado. The Defense Innovation Unit (DIU) and the Test Resource Management Center managed the evaluation. Nineteen companies advanced to the event following an earlier qualification process involving 49 companies, while an initial pool of 25 vendors was reported for the selection process.   Nine Companies Selected The order is divided between two categories: Deep Strike, for longer-range missions, and Close Quarters Battle, for shorter-range operations in confined environments. The boundary between the categories is approximately 15 kilometers. Perennial Autonomy, manufacturer of Hornet drones, ranked first in Deep Strike with 80.1 points and is set to receive 8,000 drones. Neros, which produces first-person-view (FPV) drones, including the Archer series, ranked first in Close Quarters Battle with 88.1 points and third in Deep Strike. As the only company among the leading performers to qualify in both categories, Neros is allocated 14,000 drones. The reported allocations are: Category Company Drones Deep Strike Perennial Autonomy 8,000 Deep Strike Hyperscale 7,000 Deep Strike Neros 6,000 Deep Strike Skycutter 5,000 Deep Strike Swarm Defense Technologies 4,000 Close Quarters Battle Neros 8,000 Close Quarters Battle ORQA US 7,000 Close Quarters Battle XTEND Reality 6,000 Close Quarters Battle Vector 5,000 Close Quarters Battle ModalAI 4,000 The maximum allocation is 8,000 drones per company in a single category, or 14,000 for a company selected in both. Final contract quantities will be confirmed when the awards are issued. The evaluation tested find-fix-finish missions, requiring operators to locate, confirm and strike targets during day and night operations. The program also assesses performance, manufacturing readiness and supply-chain compliance. Its requirements include U.S.-aligned supply chains and restrictions on components from certain countries, including a reported requirement to exclude Chinese-manufactured parts.   Pentagon Plans Further Drone Procurement The Pentagon is adopting an incremental procurement strategy rather than building large stockpiles of systems that could quickly become outdated. Lessons from conflicts such as the war in Ukraine, where drone technology and electronic warfare tactics continue to evolve, are influencing the development and testing of new systems. The first phase of the program resulted in orders for approximately 30,000 one-way attack drones. The overall initiative has a planned investment of around $1.1 billion and aims to acquire more than 200,000 small drones by 2027, while building domestic manufacturing capacity for rapid production. A further selection stage is planned for reusable bomber drones. Phase III, opened in late September 2026, has an allocation of $450 million and targets approximately 60,000 additional drones, with an option for more units. It focuses on manufacturing scalability, higher production rates and performance in contested environments. The phase also sets target prices of $3,000 for Close Quarters Battle drones and $5,000 for Deep Strike drones. Through successive procurement rounds, the Pentagon aims to increase drone availability while allowing manufacturers to improve their systems as operational requirements and technology change.

Read More → Posted on 2026-10-24 13:35:35
 U.S 

ANDERSEN AIR FORCE BASE, Guam, — The U.S. Army has activated the 3rd Battalion, 43rd Air Defense Artillery Regiment on Guam, establishing a permanent air and missile defense unit to strengthen the island’s protection and support U.S. military operations across the Indo-Pacific. The activation ceremony took place at Andersen Air Force Base. The battalion falls under the 38th Air Defense Artillery Brigade and the 94th Army Air and Missile Defense Command. It replaces Task Force Talon, which deactivated in July 2026 after more than a decade of air defense operations on the island. The battalion will provide the Army’s contribution to the broader Guam Defense System, with responsibilities that include maintaining readiness and integrating sensors, command-and-control systems, launchers and interceptors into a coordinated defensive network. Lt. Col. Joshua Urness, the battalion commander, said soldiers had developed the procedures, relationships and integration needed to connect these systems and support a unified defensive architecture. He described the activation as an important step in establishing the Army’s permanent contribution to Guam’s strategic defense. Col. Moseph Sauda, commander of the 38th Air Defense Artillery Brigade, told soldiers that their vigilance would have strategic consequences, their readiness would help shape regional stability, and their professionalism would contribute to maintaining security.   From Task Force Talon to a Permanent Unit Task Force Talon established a dedicated air defense presence on Guam in 2013 to operate the Terminal High Altitude Area Defense (THAAD) system, which is designed to intercept incoming ballistic missiles during the later stages of flight. The task force worked with the Guam Army National Guard and other military services to maintain operational readiness. Its deactivation in July 2026 marked the end of the temporary task force structure, with the new battalion carrying forward its operational experience in a permanent formation. The battalion is expected to support a layered defense involving THAAD, Patriot and the Indirect Fire Protection Capability (Enduring Shield). These systems are intended to address different threats, including ballistic missiles, cruise missiles, aircraft and drones. Earlier reporting indicated that approximately 120 soldiers had been assigned to the battalion on Guam, in addition to existing THAAD personnel.   Guam’s Strategic Role in Indo-Pacific Defense Guam is a key U.S. military hub supporting joint operations across the Indo-Pacific. Its air and missile defenses are intended to protect the military personnel, facilities and infrastructure required to sustain those operations. The establishment of a permanent battalion reflects the U.S. Army’s focus on maintaining sustained, integrated air and missile defense capabilities in the region amid security concerns involving China and North Korea. The unit also preserves the historical lineage of the 43rd Air Defense Artillery Regiment, whose predecessor organization was established in the Philippine Islands in 1916.

Read More → Posted on 2026-10-24 13:29:18
 U.S 

SAN DIEGO, — General Atomics Aeronautical Systems, Inc. (GA-ASI) has partnered with Spirit Defense, a Boeing company, to expand production of the U.S. Air Force’s FQ-42 Vengeance uncrewed fighter under the Collaborative Combat Aircraft (CCA) programme. Spirit Defense will design and manufacture fuselages for the aircraft, adding engineering and manufacturing capacity as GA-ASI prepares to increase production. The partnership follows the Air Force’s June 2026 production contract award to GA-ASI. The aircraft received the Vengeance name in September 2026. GA-ASI President David R. Alexander said the company had established its design, development and manufacturing capabilities for the FQ-42, and that the agreement would increase capacity and improve production resilience by reducing reliance on a single manufacturer. Spirit Defense President and CEO Keith Schrader said the company would contribute its manufacturing expertise to the programme. The company has renovated a 50,000-square-foot facility to support fuselage production. Specific production quantities and delivery schedules for its work have not been disclosed. Founded in 1992, GA-ASI has traditionally manufactured its own uncrewed aircraft. Its portfolio includes the MQ-9A Reaper, MQ-1C Gray Eagle, MQ-20 Avenger, MQ-9B SkyGuardian and MQ-9B SeaGuardian. GA-ASI has stated that it can produce six FQ-42 aircraft per month and has additional manufacturing space available.   FQ-42 Development and CCA Programme The FQ-42 is designed to operate alongside crewed fighter aircraft as part of the Air Force’s CCA programme. The Air Force selected GA-ASI’s FQ-42 Vengeance and Anduril Industries’ FQ-44 Fury for initial production under Increment 1. The programme has an initial target of 150 uncrewed fighters by 2030, with a longer-term objective of acquiring up to 500 aircraft. Air Force officials have also stated a goal of fielding at least 500 CCAs by 2032. The YFQ-42A prototype completed its first flight in August 2025. In September 2026, the Air Force received an FQ-42 at Creech Air Force Base, Nevada, for further testing and evaluation. The aircraft has also flown in formation with F-35 and F-15E fighters in preparation for collaborative operations. The FQ-42 features a modular design that allows mission systems to be replaced and new autonomy software to be integrated. According to GA-ASI, its software architecture has been validated through live flight tests across multiple airframes to support human-machine teaming. The aircraft also has an internal weapons bay and design features intended to reduce its radar signature. The Vengeance draws heavily on GA-ASI’s Gambit family of modular combat aircraft, which uses a common core chassis demonstrated through the XQ-67A Off-Board Sensing Station.   International Gambit Opportunities GA-ASI is also discussing its Gambit family with international military customers. Drawing on development work involving the FQ-42, XQ-67A and MQ-20 Avenger, proposed variants are designed for electronic warfare, suppression and destruction of enemy air defences (SEAD), and stand-off precision strikes. International customers could participate in manufacturing and integrate their own sensors, weapons and proprietary combat technologies. The Spirit Defense agreement expands the industrial base supporting the FQ-42 as the Air Force advances its CCA programme. However, the number of fuselages Spirit Defense will produce and its delivery schedule remain undisclosed.

Read More → Posted on 2026-10-24 13:06:52
 World 

PRAGUE, — Czech defence manufacturer KBP International has unveiled its new GRYF unmanned aircraft, designed to carry interceptor drones and lightweight missiles to engage hostile unmanned aerial vehicles (UAVs). The system was presented at the 16th Future Forces Forum at PVA Expo Prague in the presence of Czech President Petr Pavel and military officials.   GRYF Designed for Long-Endurance Counter-Drone Operations Unlike conventional strike drones, GRYF operates as a flying weapons carrier that can remain airborne for extended periods and deploy counter-drone interceptors against incoming threats. The platform is intended to support a layered air defence approach by positioning interceptors near protected areas. According to specifications provided by the manufacturer, GRYF has an endurance of up to 12 hours, an operational range of 500 kilometres and a cruising speed of 150 km/h. It is powered by a four-cylinder internal combustion piston engine. The aircraft features four hardpoints and a maximum payload capacity of 50 kg, allowing it to carry lightweight interceptor missiles weighing approximately 5 kg each. At the Prague exhibition, KBP displayed GRYF in two configurations: one equipped with small interceptor missiles and another carrying interceptor drones. Its modular design allows operators to change payloads according to mission requirements.   Focus on Cost-Effective Air Defence KBP presented GRYF as a potential solution to the growing demand for more affordable counter-drone capabilities. By remaining on patrol near critical infrastructure, the aircraft can position interceptors to engage hostile drones, potentially reducing the cost per engagement compared with conventional ground-based air defence missiles. Its airborne deployment concept could also extend defensive coverage beyond the reach of fixed launch sites.   KBP Expands Drone Manufacturing Capabilities GRYF builds on KBP Group’s more than 30 years of experience in composite aircraft structures. The company manages the design and manufacturing of unmanned aircraft, piston aero engines and key structural components in-house, covering processes from initial design and prototyping to series production. KBP is expanding its production facilities to increase manufacturing capacity for its own products and support cooperation with other European aerospace and defence companies.   TARON and SABRE Also Presented Alongside GRYF, KBP introduced two other unmanned aircraft at the exhibition. The TARON is a piston-powered target and one-way attack drone with an endurance of 30 minutes, a range of 70 kilometres and a maximum flight altitude of 1,500 metres. The SABRE is a jet-powered drone designed for high-speed operations. It can reach speeds of 400 km/h, has a range of 400 kilometres and carries a payload of 30 kg. It is designed for launch from mobile catapults to support flexible field operations. KBP International served as a main partner of the 16th Future Forces Forum, which ran from October 21 to 23, 2026, bringing together approximately 530 exhibitors and official delegations from 65 countries. The company has not yet announced production timelines or initial customers for the GRYF system. Main Sourec : Militarnyi

Read More → Posted on 2026-10-23 17:01:15
 World 

RIYADH, Saudi Arabia, — Saudi Arabia appears to be expanding its al-Duwadimi ballistic missile complex to support the production of larger solid-fuel missiles capable of carrying heavier payloads or reaching longer distances, according to satellite imagery analysis by researchers at the US-based Foreign Policy Research Institute (FPRI), reported by Reuters. Researchers Sam Lair and Michael Duitsman examined images from US-based Planet Labs covering April 2025 to September 2026. The complex is located approximately 200 kilometres (125 miles) west of Riyadh.   New Facility for Missile Production The imagery shows a new building at least twice the size of the existing facility believed to contain missile motor casting pits. Construction began with ground clearing and excavation in April 2025. Images from December 12, 2025, showed two deep pits inside the unfinished structure, while images from September 18, 2026, showed heavy-duty blast-diverting walls installed on either side, with the roof still partly unfinished. Researchers assess that the pits are used to pour solid-propellant mixtures into missile motor casings, where the material hardens. The protective walls are designed to direct accidental explosions away from nearby structures. A second new building may be intended for storing propellant ingredients or finished missile components. The researchers estimate that production could begin by the end of 2026, although installing specialised equipment may take several additional months. πŸ‡ΈπŸ‡¦ Saudi Arabia appears to be expanding its ballistic missile factory to build larger solid-fuel missiles, according to researchers who analyzed commercial satellite images, Reuters reports. Images taken between April 2025 and September 2026 show a new building at the al-Duwadimi complex, about 200 km (125 miles) west of Riyadh, at least twice the size of the existing facility and likely used for casting missile motors. A second new building may store fuel ingredients or finished components. Researchers Sam Lair and Michael Duitsman of the Foreign Policy Research Institute said the expansion would let the kingdom produce missiles with longer ranges or heavier payloads, and the facility could start production as early as the end of 2026. — Military Summary (@MilitarySummary) October 23, 2026 Possible Chinese Missile Technology Solid-fuel missiles can be stored for long periods and prepared for launch more quickly than liquid-fuel systems. Saudi Arabia acquired approximately 40 Chinese DF-3 liquid-fuel ballistic missiles in 1987, according to a declassified 1991 CIA estimate. Two were publicly displayed during a military parade in 2014. Lair and Duitsman have also identified what they assessed as wreckage in Yemen from a Chinese-designed DF-15 solid-fuel ballistic missile fired by Saudi forces. Lair said Saudi Arabia may already be manufacturing the DF-15 and assessed that the expanded facility could support production of the longer-range DF-21 or a comparable system. However, the satellite imagery does not confirm which missiles the facility will produce.   Strategic Implications The expansion comes as Saudi Arabia seeks greater self-reliance in defence manufacturing. Longer-range missiles could strengthen its ability to deter potential threats from Iran and support military operations involving Yemen's Houthi forces. The development could also influence regional security and discussions over a proposed US-Saudi civilian nuclear cooperation agreement. Some US lawmakers have raised concerns about potential weapons-proliferation risks associated with nuclear cooperation, while Saudi Arabia denies pursuing a nuclear weapons programme. The United States has long restricted exports of longer-range missile systems, contributing to Saudi Arabia's historical reliance on China for such capabilities. The Saudi embassy in Washington and the kingdom's Information Ministry did not respond to requests for comment, according to Reuters. The findings are based on open-source satellite imagery and researchers' assessments; the exact missile types, production capacity and operational timeline remain unconfirmed.

Read More → Posted on 2026-10-23 16:49:51
 India 

NAGPUR, India, — Solar Defence and Aerospace Ltd. (SDAL) has begun delivering its indigenous Nagastra-2 anti-tank loitering munition system to the Indian Army following successful technical trials at the Mahajan Field Firing Range (MFFR) in August 2026. During the trials, the system’s operational performance and compliance with Electronic Counter-Countermeasures (ECCM) requirements were evaluated.    Nagastra-2 Capabilities Designed for precision strikes against armoured targets, Nagastra-2 carries a 4 kg tandem shaped-charge warhead capable of penetrating up to 650 mm of Rolled Homogeneous Armour (RHA). It offers an operational range of 25 km in recover-and-reuse mode and 50 km in fire-and-forget mode, with an endurance of up to 60 minutes. The system features day-and-night electro-optical/infrared (EO/IR) surveillance cameras to support target observation and engagement. It also uses encrypted video and telemetry links and incorporates an ECCM suite designed to improve resilience against electronic warfare threats, including communication jamming, GPS jamming and spoofing.   Testing and Indigenous Manufacturing Before delivery, the system was also tested in different operational environments, including high-altitude conditions in Ladakh and the plains of Babina, Uttar Pradesh. Manufactured at SDAL’s Nagpur facility, Nagastra-2 is part of India’s efforts to expand domestic defence manufacturing and develop indigenous precision-strike systems.   Previous Nagastra-1R Deliveries The latest delivery follows the Indian Army’s 2025 order for approximately 450 Nagastra-1R loitering munitions under emergency procurement. SDAL delivered these systems in mid-October 2026. The Nagastra-1R features a reusable launcher system, a 360-degree gimbal camera with an optional thermal camera for night operations, encrypted video and telemetry communications, and a reported 2-metre Circular Error Probable (CEP). The company has stated that the Nagastra-1R contains more than 80% indigenous components.  According to SDAL, Nagastra-2 adds another system to its loitering munition portfolio for the Indian Army, supporting precision engagement of armoured targets and the development of Made-in-India defence technologies.

Read More → Posted on 2026-10-23 16:36:21
 U.S 

EL SEGUNDO, California, — The U.S. Space Force has awarded its first operational contracts under the Commercial Augmentation Space Reserve (CASR) programme to six companies providing satellite tracking and space surveillance capabilities during military crises and periods of increased demand. The selected companies are Anduril, LeoLabs, Slingshot Aerospace and InTrack of the United States, EOS Space Systems of Australia, and NorthStar Earth & Space of Canada. The contracts were awarded through the ACCESS framework, used by Joint Commercial Operations (JCO) to procure commercial data and data-fusion services.   Space Surveillance Capabilities The contracts focus on Space Domain Awareness (SDA), including tracking satellites, monitoring orbital manoeuvres, and identifying space debris and spacecraft breakups. The companies will provide commercial data and services to support JCO activities during routine operations and periods of increased demand. CASR is modelled on the U.S. Air Force’s Civil Reserve Air Fleet (CRAF), which uses commercial aircraft to supplement military airlift during national emergencies. Developed since 2022, CASR allows the military to expand its use of commercial space capabilities without owning and maintaining all the required infrastructure. The programme has three operational levels: day-to-day operations for routine monitoring, priority operations during regional conflicts, and full CASR execution during major international crises or war.   From Pilot Phase to Operational Contracts A pilot programme began in 2025, when four space domain awareness companies received 90-day contracts worth a combined $1.1 million. The Space Force subsequently conducted wargames and training exercises to test the integration of commercial data and services into military operations. The new contracts move CASR into its operational phase for space domain awareness. All six companies already work with the Joint Commercial Operations Cell, which integrates commercial space data and shares it with U.S. military and international partners. Lt. Col. Brandon Galindo said operators consider these companies trusted sources when additional tracking is required, including after an on-orbit event that generates debris. Col. Timothy Trimailo, director of the Space Systems Command’s Commercial Space Office, said the programme integrates established commercial capabilities into government systems when additional capacity is needed. The selection process assessed commercial offerings, readiness and integration pathways. The financial values of the new contracts were not disclosed, although officials described the initial amounts as relatively low. Funding may be adjusted as combatant commands identify demand.   Future Expansion The vendor pool remains open to additional companies with proven, trusted capabilities. The Space Force is also evaluating future CASR applications in satellite communications, launch services, and spacecraft telemetry, tracking and command. The programme aims to strengthen U.S. space surveillance by combining commercial and government systems. Space Systems Command plans to apply lessons from the initial contracts to future commercial integration. Interested companies can contact the Space Force through its established industry engagement channels.

Read More → Posted on 2026-10-23 16:30:01
 World 

TEHRAN, Iran, — Iran is continuing restoration work at its Eagle 44 (Oghab 44) underground airbase in southern Hormozgan province following at least three reported rounds of airstrikes against the facility in 2026. Satellite imagery captured by Planet Labs on September 29 shows that runway obstacles have been removed, a new taxiway section has been completed and further construction is underway.    Satellite Images Show Restoration Progress Located in the foothills of the Zagros Mountains, approximately 100 miles (160 kilometres) northwest of the Strait of Hormuz, Eagle 44 is operated by the Islamic Republic of Iran Air Force (IRIAF). Its underground tunnels and hangars are designed to shelter aircraft and other military equipment. The main runway measures approximately 2.7 miles (4.3 kilometres). According to The War Zone, the latest imagery shows that the main runway, previously blocked by obstacles, is now clear. A new section of the western taxiway, including its concrete surface, has been completed. Work on the adjoining section is continuing, with compacted, stabilised soil laid but paving still unfinished. Once completed, the second taxiway would provide another connection between the western underground hangars and the main runway. However, craters remain visible near the western tunnel entrances, while two support buildings remain destroyed and a third is damaged. Debris from damaged equipment has also been cleared from taxiway areas.    Base Was Targeted Multiple Times in 2026 Eagle 44 was targeted during the conflict that began on February 28, 2026, with further damage reported in late March and around July 15–16. Earlier imagery showed craters near the tunnel entrances, damage to surface infrastructure and obstacles placed along the runway. The Pentagon and U.S. Central Command have not publicly identified Eagle 44 as a specific strike target, and Iran has not acknowledged attacks on the facility. The latest satellite imagery confirms visible surface repairs, but it does not establish the condition of the underground hangars or the equipment stored inside.    Iran Unveiled Eagle 44 in 2023 Iranian state media first presented Eagle 44 publicly in February 2023, showing F-4 Phantom fighter jets, drones and missile systems operating from the underground complex. Construction of the tunnel network began around 2013, while work on the main runway started several years later. The restoration comes amid U.S. assessments that Iran's air force has suffered severe losses. U.S. Central Command chief Admiral Brad Cooper told Congress in May 2026 that Iranian air force combat sorties had fallen from between 30 and 100 daily before the campaign to zero. However, the current number and operational condition of Iran's remaining aircraft are unclear. The latest imagery indicates that Iran is prioritising runway clearance and taxiway reconstruction at Eagle 44, although the extent to which the facility can resume full operations remains unknown.

Read More → Posted on 2026-10-23 16:05:33
 World 

XI’AN, China, — Commercial satellite imagery has revealed four of China’s KJ-3000 airborne early warning and control (AEW&C) aircraft at the Xi’an-Yanliang airfield complex in Shaanxi province, raising the possibility that the programme is moving towards low-rate or serial production. However, the imagery does not confirm that serial production has begun.   Four Aircraft Seen at Xi’an-Yanliang The imagery, captured by Vantor on October 5, 2026, and examined by independent analysts, including MizarVision, shows three aircraft near the Xi’an Aircraft Company (XAC) production facilities and a fourth at the nearby China Flight Test Establishment (CFTE). J. Michael Dahm of the Mitchell Institute for Aerospace Studies assessed the sighting as consistent with the programme entering serial production. However, analyst Andreas Rupprecht cautioned that the four aircraft could be previously identified prototypes gathered at the same location. Clearer photographic evidence, including aircraft serial numbers and operational paint schemes, would help establish their production status. CHINA | Four KJ-3000 Radar Aircraft Spotted in New Satellite Imagery New Vantor satellite imagery captured on October 5, 2026, reveals four Chinese KJ-3000 airborne early warning and control (AEW&C) aircraft at Xi’an-Yanliang. Three aircraft are positioned near the Xi’an Aircraft Company production facilities, while a fourth is visible at the nearby flight-test establishment. The presence of four KJ-3000 aircraft raises the possibility that China has entered low-rate or serial production of its next-generation airborne early warning platform. Based on the Y-20B airframe, the KJ-3000 is designed to strengthen long-range surveillance, aerial command and control, and coordination of combat aircraft across the Indo-Pacific. These capabilities could significantly enhance Chinese operations around Taiwan and the South China Sea. However, the imagery does not conclusively establish serial production. All four aircraft could still be previously identified prototypes. Imagery: Vantor Captured: October 5, 2026 Published: October 22, 2026 Analysis: @MizarVision — MizarVision (@MizarVision) October 23, 2026 KJ-3000 Design and Capabilities The KJ-3000 is based on China’s domestically developed Y-20B heavy transport aircraft and is powered by four Chinese-made Shenyang WS-20 turbofan engines. Its design features a large circular radar dome on the upper fuselage and an in-flight refuelling probe above the cockpit. The aircraft is expected to use advanced active electronically scanned array (AESA) radar technology for airborne surveillance and command-and-control missions. Its first flight-testing appearance was reported in December 2024, and two prototypes, identified by numbers 7821 and 7822, had been documented in open sources before the latest satellite imagery. The KJ-3000 is expected to succeed the KJ-2000, which was built using imported Russian Il-76 airframes. Only four KJ-2000 aircraft were completed, making the domestically based KJ-3000 an important development for China’s large airborne early warning fleet.   Significance for China’s Air Surveillance China operates approximately 70 airborne early warning and control aircraft, with the smaller, turboprop-powered KJ-500 forming a major part of its fleet. The larger KJ-3000 is intended to strengthen long-range surveillance, aerial command and control, and coordination of combat aircraft. If the programme advances to regular production and service, the aircraft could improve China’s ability to monitor and coordinate air operations across the Indo-Pacific, including areas around Taiwan and the South China Sea. For now, the four aircraft visible in the satellite imagery indicate possible progress in the programme, but further imagery or official confirmation is needed to establish whether serial production has started.

Read More → Posted on 2026-10-23 15:52:10
 World 

MOSCOW, — Russia’s state-owned Rostec corporation has announced that the integrated flight control system developed for the SJ-100 Superjet has completed a three-year qualification programme involving approximately 1,500 tests, bringing the system closer to certification. Developed by enterprises of the Radio-Electronic Technologies Concern (KRET), the system transmits pilot commands to the aircraft’s flight control surfaces and actuators. Development is led by the Moscow Institute of Electromechanics and Automation (MIEA), which coordinates work across multiple factories and research institutes.   Extensive Testing and Safety Features The qualification programme covered approximately 500 components and systems across more than 30 categories of external impacts. Testing assessed resistance to vibration, humidity, icing, electromagnetic interference, voltage surges, salt fog, sand, dust, fire, water, magnetic fields, radio-frequency interference and contaminating fluids. Engineers also verified strength, service-life characteristics, and hardware and software compliance. Lightning-protection tests subjected the equipment to voltage pulses of up to 1,500 volts, approximately 55 times the normal onboard electrical system voltage, to assess its ability to withstand short-duration electrical disturbances. Thermal testing exposed the hardware to temperatures ranging from −55°C to +85°C, beyond its specified operating range of −40°C to +70°C. The programme also included assessments under simulated fire conditions. The system features four-channel redundancy, including four distinct rudder-control channels with dissimilar designs. This architecture is intended to maintain aircraft controllability if individual components or channels fail. Rostec states that the system is designed to meet a maximum failure probability of one in a billion (10⁻⁹). KRET Chief Executive Alexander Pan said Russian enterprises had produced the system entirely, from design drawings to serial production samples, and that its performance was comparable to foreign equivalents. SJ-100 chief designer Kirill Kuznetsov described the integrated control system as one of the aircraft’s key systems, with particularly high reliability requirements. According to Rostec, the test results confirm that the system meets safety requirements and is ready for use on the aircraft.   Part of Russia’s Import-Substitution Programme The development is part of Russia’s broader effort to replace foreign aerospace components with domestically produced alternatives following Western sanctions. KRET is manufacturing approximately 650 components across 11 enterprises for the Superjet programme, including avionics, control panels, lighting systems, hydraulic and fuel-system sensors, warning devices and flight-data recording equipment. More than 40 categories of foreign components have been replaced with Russian-made alternatives for the SJ-100. The aircraft is also transitioning to domestically produced PD-8 turbofan engines, developed by the United Engine Corporation (UEC), which completed their own certification test campaigns earlier in 2026, according to the provided information. The SJ-100 is a regional passenger jet designed to carry up to 103 passengers. Prototype flight testing continued in September and October 2026, including activities in Minsk, Belarus, and Novosibirsk, with work focused on systems such as the autopilot and automatic landing capabilities.   Final Certification Still Pending Rostec confirmed that the integrated flight control system has entered the final stage of certification. However, completion of the qualification programme does not constitute final approval. Certification by Russian aviation authorities and subsequent operational performance will determine whether the system meets the requirements for commercial airline use.

Read More → Posted on 2026-10-23 15:44:14
 Europe 

MADRID, SPAIN — The Spanish Navy and state-owned shipbuilder Navantia are developing an enhanced version of the F110 Bonifaz-class frigate, known as the F110 Integrated Air and Missile Defence (IAMD) variant, to strengthen Spain’s naval air and missile defence capabilities. The project follows the Spanish Navy’s Armada 2050 strategic requirements and builds on the five baseline F110 frigates currently under construction. Navantia displayed a scale model of the proposed F110 Flight II/IAMD configuration at DALO Industry Days 2026 in Denmark.   Larger Design and Increased Missile Capacity The proposed frigate will measure approximately 150 metres long, with a beam of around 18.6 metres and a displacement of approximately 6,700 tonnes, compared with 145 metres and 6,100 tonnes for the baseline F110. Earlier design information indicates a crew of around 170, a maximum speed exceeding 29 knots and a cruising speed above 18 knots, supported by more powerful gas turbines. Its 64 Mk 41 Vertical Launch System (VLS) cells, compared with 16 on the baseline F110, will be arranged in forward and aft groups to accommodate different missile types, including longer-range surface-to-air missiles. An enhanced Lockheed Martin SPY-7 solid-state radar will support the detection, tracking and engagement of multiple threats, including ballistic missiles, cruise missiles and uncrewed aerial systems. The frigate is designed for area air defence, escorting high-value assets and coordinating air defence within naval task groups.   Advanced Combat Systems and Multi-Mission Capabilities The F110 IAMD will use SCOMBA New Generation (NG), Navantia’s next-generation combat management system. Its cloud-based architecture will integrate sensors, weapons, onboard systems, data links and uncrewed vehicles (UxVs), providing a shared tactical picture and supporting interoperability with NATO and European Union task groups. Its open, scalable and cyber-secure design will allow the integration of future sensors, weapons and countermeasures. The frigate will retain the F110 family’s anti-submarine warfare (ASW), anti-surface warfare (ASuW) and electronic warfare capabilities, alongside asymmetric-threat protection. Its mission space will accommodate mission modules, uncrewed vehicles and a second helicopter. Navantia’s Smart Ship technologies will include a Digital Twin, condition-based maintenance and an integrated platform management system to monitor ship condition, anticipate maintenance needs, improve operational availability and support crew training. Earlier design information also identified onboard 3D printing for producing spare parts during deployments.   Industrial Impact and Programme Status The programme is expected to involve more than 500 Spanish companies, technology centres and academic institutions, supporting domestic shipbuilding capabilities and Spain’s strategic autonomy. Earlier public presentations indicated plans for two F110 Flight II/IAMD frigates in addition to the five baseline ships. Their final configuration is being refined by Navantia, the Spanish Navy and the Ministry of Defence according to operational requirements and the procurement process. Construction of the first five F110 frigates continues at Navantia’s Ferrol shipyard. The lead ship, Bonifaz (F111), was launched in September 2025 and is undergoing fitting out, with delivery planned for 2028. The remaining ships are at different stages of construction. The F110 IAMD programme will extend the existing frigate family with stronger air and missile defence capabilities while retaining its multi-mission role.

Read More → Posted on 2026-10-23 15:37:04
 U.S 

WASHINGTON, — The US Missile Defense Agency (MDA) has awarded California-based defence company Long Wall $75 million to complete flight testing of its Cyclops low-cost missile interceptor. The company announced the award on October 22 and will contribute an additional $75 million of its own funding, bringing the combined investment to $150 million.   Cyclops Interceptor Designed for Mass Production Long Wall began developing Cyclops in 2024 using its own funding and publicly unveiled the system in December 2025. The liquid-fuelled, exo-atmospheric interceptor is designed to engage enemy missiles during the midcourse phase of flight, outside Earth's atmosphere. The company describes it as the first interceptor in its class designed specifically for mass production. Cyclops uses commercial off-the-shelf components and additive manufacturing, including 3D printing, to support its manufacturing approach. According to Long Wall, the interceptor fits inside a standard shipping container, allowing it to be launched from ground sites or sea-based platforms.   $150 Million for Development and Testing Long Wall will invest an additional $75 million in private funding alongside the MDA award to continue Cyclops design, development and testing. The company said it had already spent two years of private capital on the programme. Co-founder and Chief Executive Officer Dan Piemont said rising demand for interceptors, limited production capacity and high unit costs had created challenges in replenishing missile defence inventories. He described the award as a significant commitment to developing a new approach to long-range missile defence. Long Wall co-founder, Chairman and President Harry O’Hanley said the company was using modern computing hardware and advances in optics and propulsion manufacturing to support the programme. The company operates development, testing and production facilities spanning more than 180,000 square feet across 100 acres at three major sites. Headquartered in Long Beach, California, Long Wall has operations in California, Alaska and Alabama. It was formed in February 2025 through the rebranding of ABL Space Systems, which shifted its focus from small satellite launch vehicles to missile defence. The MDA award announcement did not specify the number of interceptors to be tested or provide a detailed flight-test schedule. The contract duration and production timeline were also not disclosed.   US Expands Search for Lower-Cost Interceptors Cyclops is intended to perform a midcourse interception role similar to that of the US Ground-Based Interceptor (GBI), currently built by Northrop Grumman. The MDA is also exploring lower-cost interceptor options for the terminal phase, when incoming missiles re-enter the atmosphere. In August 2026, the agency awarded nearly $11 million to X-Bow Systems to flight-test a solid-fuel interceptor being considered as a potential lower-cost alternative to systems such as the Patriot. Long Wall’s award is part of wider US efforts to develop missile defence systems that can be manufactured in greater numbers while addressing production capacity and cost challenges.

Read More → Posted on 2026-10-23 15:27:57
 Europe 

COPENHAGEN, — Denmark will acquire Anthem ground-launched cruise missiles from US defence company Covenant Industries and Joint Strike Missiles (JSM) from Norway’s Kongsberg, marking the country’s first land-based capability to strike targets deep inside enemy territory. The Danish Ministry of Defence announced the procurement following a recommendation from the chief of defence. Contracts managed by Denmark’s Defence Acquisition and Logistics Organisation (DALO) have been signed, but quantities, costs and delivery schedules remain undisclosed for security reasons. Officials cited competitive pricing and relatively quick delivery as factors in the selection. Defence Minister Jeppe Bruus said the acquisitions would strengthen Denmark’s defence capabilities, support its contribution to NATO and demonstrate its ability to respond to an attack.   Anthem Cruise Missile and Production The Anthem is a low-cost, ground-launched cruise missile designed for high-volume production. It uses a solid-fuel rocket booster for launch and a heavy-fuel jet engine for flight, carrying a 200 kg (440-pound warhead) for precision strikes. Media reports estimate its range at more than 1,000 km (620 miles), with some estimates reaching 1,200–1,500 km (750–930 miles). Covenant aims to price it below $1 million per missile. Founded in 2024 by Michael Kaufman and Ofir Dayan, Covenant conducted Anthem’s first flight in August 2025. The missile has undergone more than 200 flight tests, including tests with US forces, but has not been used in combat. Denmark’s missiles will be produced at Covenant’s 10,000-square-metre facility in Leipzig, Germany, which opened in October 2026. Production is scheduled to begin in 2027, with targets of 1,000 missiles in the first year and 5,000 in 2028. More than 95% of components for the European version are expected to come from Europe. Basic assembly will take place in Leipzig, while warheads will be integrated at customer sites. The first Danish deliveries are expected after production begins.   Joint Strike Missile for F-35 Fighters Denmark is also acquiring the Joint Strike Missile (JSM), developed by Kongsberg in cooperation with Raytheon. Designed to fit inside the internal weapons bays of Denmark’s F-35A fighters, the missile allows the aircraft to maintain its low-observable configuration. The JSM measures 4 metres, weighs 416 kg (917 pounds), carries a 120 kg (265-pound warhead) and has a range exceeding 350 km (217 miles). It travels at high-subsonic speeds and uses inertial and GPS navigation with an imaging-infrared seeker for autonomous target recognition. It is derived from Kongsberg’s Naval Strike Missile (NSM), already used by Denmark for coastal defence and on its frigates. Germany’s Interest and Russian Response Germany is discussing its long-range strike requirements with Covenant, although no purchase has been announced. The Bundeswehr is evaluating low-cost cruise missiles, with Anthem reportedly competing against Ukraine’s Flamingo cruise missile, developed by Fire Point. Covenant has appointed retired German Army Lieutenant General Andreas Marlow, a former deputy commander, as an adviser. Russian Ambassador to Denmark Vladimir Barbin criticised the acquisition, describing Danish policy as confrontational and focused on preparing for possible conflict with Russia. He also called it a dangerous illusion to believe such weapons could pose a military threat to a nuclear power. The procurement expands Denmark’s capabilities beyond its traditional focus on territorial defence, providing complementary land-based and air-launched options for long-range precision strikes while strengthening its contribution to NATO.

Read More → Posted on 2026-10-23 15:04:35
 World 

OTTAWA, Canada, — European defence group Czechoslovak Group (CSG) and Canadian defence technology company North Vector Dynamics (NVD) have signed a memorandum of understanding (MoU) to explore European manufacturing and supply-chain opportunities for NVD products, including the integration of its CM-70 counter-drone interceptor into CSG defence systems. Announced on October 22, 2026, the agreement builds on CSG’s strategic investment in NVD, completed in August 2026, and marks a move towards industrial cooperation between the companies.   CM-70 Counter-Drone Interceptor The CM-70 is a precision-guided missile interceptor designed to engage high-speed, highly manoeuvrable Group I–III uncrewed aerial systems (UAS). NVD positions it as a lower-cost option for countering drone threats faced by NATO members and partner countries. According to published specifications, the interceptor weighs approximately 3 kg, measures 0.9 metres in length, reaches speeds of 900 km/h and has an operational range of 3.5 km. It uses semi-active laser guidance and a forward-firing fragmentation warhead. Its open architecture is intended to support integration with existing layered air-defence systems. The CM-70 can be launched from ground, vehicle and airborne platforms. NVD states that the system is ITAR-free and compliant with the US National Defense Authorization Act.   European Manufacturing and Integration Plans Under the MoU, CSG and NVD will evaluate options for European production, supply chains and integration of the CM-70 into CSG systems. However, the agreement does not commit either company to a manufacturing programme. The companies have not identified the specific CSG systems being considered for integration, a production site, manufacturing volumes or a delivery schedule. NVD will retain full ownership and control of its intellectual property, while design and engineering authority for its technology will remain in Canada. CSG is expected to contribute industrial capacity, systems-integration expertise and access to its commercial network across NATO countries, Ukraine and other partner nations. CSG, which employs more than 14,000 people, reported revenue of €6.7 billion in 2025. The group continues to expand its aerospace and defence business through partnerships and acquisitions. The MoU establishes a framework for the companies to assess European manufacturing and integration opportunities while keeping NVD’s intellectual property and engineering authority under Canadian control.

Read More → Posted on 2026-10-23 14:55:17
 World 

ABU DHABI, UAE, — UAE-based defence conglomerate EDGE Group has achieved full-rate production at its subsidiary LAHAB’s automated 40x53mm grenade ammunition manufacturing line, which has an annual production capacity of up to 1.5 million rounds.   Automated Production Line The line began operating at the end of 2025 and assembles sub-components into finished, belted rounds without manual intervention. The manufacturing process consists of three modules: cartridge case assembly and filling, projectile filling and assembly, and final assembly and belting. LAHAB Chief Executive Officer Mohammed Arbabi said advanced automation had reduced manual labour requirements by nearly 60%, improving efficiency, increasing annual output and providing a scalable foundation for 40mm grenade manufacturing. The facility follows Industry 4.0 standards, monitoring operations and recording production data across all three modules. Its real-time digital dashboard displays throughput, module performance and overall production status, allowing operators to identify and correct deviations while production continues.   EDGE Expands Smart Manufacturing The upgrade is part of EDGE’s wider smart-manufacturing programme, coordinated by BRIDGE, the group’s function for innovation, operational excellence and industrialisation. In 2025, EDGE completed more than 68 Industry 4.0 transformation projects across 28 production facilities and doubled manufacturing capacity at 13 of its entities. Other EDGE companies have also introduced automation. HALCON’s upgraded DESERT STING 16 guided-glide weapon assembly line uses 11 industrial robots, more than 300 sensors and six machine-vision stations, alongside automated material handling and inspection. The upgrade increased production volume by 130% and reduced labour content by 23%. CARACAL, EDGE’s firearms and small-calibre ammunition manufacturer, introduced an automated storage and retrieval system that increased storage density by approximately 80% and made storage and retrieval operations three times faster, eliminating the need for a new warehouse.   Strengthening Defence Manufacturing LAHAB, HALCON and CARACAL form part of EDGE’s integrated defence manufacturing network in the UAE. EDGE is working to extend its smart-manufacturing model to partner nations seeking to develop their own sovereign defence industrial bases. LAHAB develops, produces and tests medium- and large-calibre munitions designed to meet US-MIL SPEC, NATO and CIP standards. Its portfolio includes 40x53mm ammunition and other grenade, mortar and artillery products. The new line strengthens LAHAB’s 40mm ammunition production capacity while supporting EDGE’s broader move towards higher-volume, data-driven manufacturing.

Read More → Posted on 2026-10-23 14:43:19
 Europe 

MADRID, — Spanish state-owned defence shipbuilder Navantia has signed a memorandum of understanding (MoU) with San Sebastián-based software company Multiverse Computing to develop, test and deploy artificial intelligence (AI) and quantum-inspired technologies for naval defence systems. The agreement brings together Navantia’s expertise in naval architecture, defence platforms and systems integration with Multiverse Computing’s capabilities in AI optimisation. The partnership will focus on adapting AI models for use aboard surface ships and submarines, including environments with limited computing resources, power and connectivity. The agreement was signed by Gonzalo Mateo-Guerrero, Navantia’s Chief Operating Officer, and Enrique Lizaso, co-founder and CEO of Multiverse Computing.   AI Applications for Ships and Submarines The companies will explore AI applications for embedded systems aboard naval vessels and submarines, signal processing, situational awareness, mission planning and logistics optimisation. The partnership will also examine applications in Command, Control, Communications and Intelligence (C4I) systems. A central part of the collaboration is Multiverse Computing’s CompactifAI technology, which compresses AI models to reduce their size and the computing resources required to run them. This could help naval systems use advanced AI where processing capacity, electrical power or network connectivity is limited. The technology is also intended to support independent onboard operation without continuous internet access or reliance on external cloud services, an important consideration for naval platforms operating in isolated environments. Navantia will contribute operational requirements, product knowledge, systems integration expertise and lifecycle support. This will help the companies assess how AI models can be moved from laboratory testing into practical naval products and maintained throughout their service life.   Companies Target European Defence Programmes Navantia said the agreement would help incorporate AI into its products and accelerate the development of more efficient and advanced naval solutions. Mateo-Guerrero said the partnership would make it possible to apply artificial intelligence to Navantia’s products and accelerate their evolution towards more efficient and advanced naval solutions. Lizaso highlighted the challenge of integrating AI into military systems, explaining that the main difficulty is moving beyond laboratory demonstrations to capabilities that naval systems can sustain throughout their entire lifecycle. For Navantia, which is wholly owned by Spain’s state holding company SEPI, the partnership supports its broader efforts to expand AI across its portfolio, strengthen domestic industrial capabilities and technological sovereignty. For Multiverse Computing, the collaboration provides an opportunity to test its AI compression and quantum-inspired optimisation technologies against the operational and lifecycle requirements of naval defence programmes. The two companies also plan to assess joint proposals for European defence and innovation programmes, extending their cooperation beyond technology development and testing.

Read More → Posted on 2026-10-22 16:39:35